One bedroom · One bathroom
34′ × 15′ · 510 sq ft overall footprint, including the covered entry.
Massachusetts ADU cost guide · Lumara One & Two
A clear view
of your budget.
Lumara One is $209,000. Lumara Two is $230,000. For $21,000 more, Two adds a second bedroom and 195 sq ft to the overall footprint. Installation and site costs depend on your property.

Two bedrooms · One bathroom
47′ × 15′ · 705 sq ft overall footprint.
Your complete project budget.
Add foundation and installation, site work and utility connections, plans and engineering, and permit or connection fees to the selected home price.
These costs depend on your property. Start with an address review for a preliminary estimate; the written proposal confirms the final scope and price.
Check your property →The full project budget
The home, and the work around it.
The home price includes construction and assembly of the building. The property review defines the additional work needed to make it a complete project.
Home construction
Both home prices cover construction and assembly, the kitchen and bathroom, interior finishes, and the plumbing, electrical, heating and cooling systems inside the home. Your written specification identifies the products and finishes for the model you choose.
Installation
Installation is priced for your property. It includes the foundation, required excavation, grading and drainage, site restoration, and connections to water, electricity and sewer or septic. We identify any special access, transport or crane requirements in the site scope.
Plans and engineering
The plans and engineering budget covers the survey, architectural drawings, structural engineering, energy and code coordination, and any investigations your site needs.
Permits and approvals
Permit, connection and other jurisdictional fees are additional. The property review and design process identify the submissions, reviews and inspections required for your address.
From estimate to agreement
How the budget takes shape.
The purpose of feasibility is to avoid committing to full design or construction before the property, delivery route, utility path, and likely permit approach make sense.
Property review
Start with your address and possible placement. Request a free preliminary project estimate covering the main site and utility questions.
Survey and site investigations
For Lumara projects, commission a new boundary and topographic survey, inspect the existing septic system where applicable, and resolve further site questions before plans.
Plans
Architectural and structural work begins only after scope and authorization are clear.
Build scope
The home, site work, utilities, installation, schedule, and contract are finalized.
What the figures mean
Know what each price covers.
Early figures help you plan. The written proposal sets out the work and price you agree to before construction.
Your written proposal records the home, installation, professional services and permit costs, with inclusions, exclusions and selections agreed before construction.
Cost questions
The useful answer is specific to the lot.
These are the questions Lumara resolves before recommending your next paid step.
What belongs in the complete project budget?
The budget should account for the home, plans and engineering, permits, foundation, utility connections, site work and applicable delivery or installation. Lumara defines inclusions, exclusions and property-dependent items in the written scope.
Is preconstruction one phase or two?
It depends on the property. Lumara requires a new boundary and topographic survey for its projects. The survey, septic inspection where applicable, and other required investigations may form an early scope before full plans and engineering. Lumara explains the work and fees before each phase is authorized.
Why can’t Lumara give one installed price for every property?
Two identical ADUs can require very different foundations, access plans, utility runs, drainage work, septic coordination, or electrical upgrades. A property review identifies those variables before they become surprises.
What can increase the site-work cost?
Long utility runs, limited delivery access, ledge, slopes, drainage conditions, tree work, electrical capacity, septic requirements, difficult excavation, and restoration needs are common cost drivers.
When does construction pricing become reliable?
Pricing becomes substantially more reliable after the property review, required site investigations, home configuration, utility strategy, permit path, and design scope are known. Lumara can then organize a defined project scope and exclusions.